Installation Process

The Solar Installation Process

A structured 7-stage approach to solar panel supply and installation — from initial enquiry through survey, design, installation, commissioning, and handover.

Start a Solar Enquiry
Solar panel installation process on a rooftop

Solar installation context imagery. Not a Dodge Solar project.

STAGE
01

Submit a Solar Enquiry

Customer Provides

Your name, contact details, property postcode, and initial interest.

Dodge Solar Reviews

Reviews the enquiry and prepares initial contact.

What Gets Confirmed

Acknowledgement of enquiry and next steps.

Why this stage matters: Ensures Dodge Solar understands your property type and solar interest before any further steps.
STAGE
02

Share Property, Roof & Product Requirements

Customer Provides

Property address, roof type, approximate roof area, existing electrical details, energy use, battery interest, and initial panel or system size thoughts.

Dodge Solar Reviews

Reviews property details, roof information, energy use, and initial product requirements to assess feasibility for survey.

What Gets Confirmed

Whether a site survey is appropriate and what information is needed to proceed.

Why this stage matters: Property and roof details shape whether a solar installation is likely to be suitable and what survey approach is needed.
STAGE
03

Review Suitability, Energy Use & Installation Goals

Customer Provides

Accurate energy use data, roof direction, shading information, planning restrictions, ownership or landlord permissions, and budget guidance.

Dodge Solar Reviews

Reviews suitability against property type, roof, energy use, electrical setup, access, and budget guidance.

What Gets Confirmed

Suitability for survey and any known constraints before proceeding.

Why this stage matters: Understanding energy use and installation goals before survey helps shape the most relevant system design recommendations.
STAGE
04

Discuss Panels, Inverters, Batteries & System Design

Customer Provides

Product preferences, battery interest, inverter considerations, monitoring requirements, and any specific product requirements.

Dodge Solar Reviews

Reviews panel options, inverter compatibility, battery suitability, system sizing, and component requirements against property and energy goals.

What Gets Confirmed

Indicative product categories and system design direction subject to survey.

Why this stage matters: Product and design discussions before survey help clarify what is being assessed and what the installation aims to achieve.
STAGE
05

Confirm Survey, Quotation, Equipment & Scope

Customer Provides

Access arrangements, site survey appointment confirmation, and review of quotation.

Dodge Solar Reviews

Conducts site survey, confirms roof condition, shading, electrical setup, access requirements, and scaffolding needs. Prepares final quotation.

What Gets Confirmed

Final equipment, installation scope, project terms, product availability, and pricing.

Why this stage matters: The formal survey and quotation confirm what can be installed, at what cost, and under what conditions.
STAGE
06

Plan Installation, Access, Electrical Work & Grid Requirements

Customer Provides

Installation date confirmation, access arrangements, DNO notifications where required, and planning permissions where applicable.

Dodge Solar Reviews

Plans installation sequence, scaffolding, electrical preparation, grid connection notification, and equipment delivery.

What Gets Confirmed

Installation date, access plan, electrical work scope, and any grid connection requirements.

Why this stage matters: Good installation planning reduces delays and ensures electrical, access, and grid requirements are addressed before work begins.
STAGE
07

Commissioning, Documentation, Handover & Aftercare Enquiry

Customer Provides

Review system documentation, monitoring setup walkthrough, and handover confirmation.

Dodge Solar Reviews

Commissions system, verifies output, completes safety checks, provides documentation, and hands over monitoring information.

What Gets Confirmed

System is operational, documentation is complete, and aftercare enquiry process is explained.

Why this stage matters: Proper commissioning and handover ensures the system is working correctly and the customer understands how to monitor and manage their installation.

Roof Condition

Roof tiles, felt, battens, and structural integrity assessed before installation proceeds.

Access & Scaffolding

Safe roof access requirements reviewed; scaffolding arranged through third-party providers.

Grid Connection

DNO notification and grid connection requirements reviewed against the specific installation.

Product Availability

Equipment availability confirmed at point of quotation; subject to supplier and lead times.

Electrical Setup

Consumer unit capacity, metering, and earthing arrangement reviewed during survey.

Permissions

Planning and building control requirements reviewed; customer responsible for obtaining required approvals.

No savings guarantee, generation guarantee, payback guarantee, export income guarantee, battery performance guarantee, product availability guarantee, compatibility guarantee, tariff benefit guarantee, warranty guarantee, installation timeline guarantee, grid connection guarantee, or energy independence guarantee is implied or provided. All estimates depend on assumptions and should be treated as indicative only.